EXIGENCYCOMPETITION

COMPETITOR PREPARATION

Arrive ready for tech,
not ready for an argument.

The public preparation path exists so a competitor can build, document and inspect against the same rules officials will use in the lane.

01

Read the current rule revision

Use the published XCS revision and the event bulletin before finalizing a competition configuration. The event bulletin selects only options that already exist in the standard.

02

Declare the vehicle architecture

Choose a proposed division based on the actual scored architecture and disclose novel or ambiguous configurations before the first scored run.

03

Build the Vehicle Passport

Document drivers, amplifiers, energy storage, charging, enclosure/coupling architecture, major conductors, protection, emergency isolation and configuration revision.

04

Prepare for pre-tech

The vehicle must pass architecture confirmation, system/resource declaration, safety inspection, measurement access and technical documentation requirements before a valid run.

05

Lock the run state

Declare cabin state, source/frequency, engine/RPM state, placement code, scoring mode and configuration. Once the run is locked, unauthorized configuration changes invalidate the attempt.

06

Preserve record evidence

Certified results require the official measurement chain, reference status, run data, required post-tech, evidence manifest and Records Authority review.

DOCUMENTS

Bring the configuration record.

Vehicle Passport revision, architecture photographs, event/rules acknowledgment and any pre-event ruling that applies to a novel configuration.

ELECTRICAL

Make every energy path inspectable.

Storage, terminals, conductors, overcurrent protection, charging paths and emergency isolation must be declared and safely accessible for inspection.

MEASUREMENT

Leave room for the official chain.

The XRP jig and official sensor must be installable without a competitor-created local cavity, horn, cup, tube or other sensor-specific pressure concentrator.

CONFIGURATION

Know what changes create a new revision.

Driver/amplifier quantity, impedance architecture, storage/charging, enclosure geometry, coupling/wall architecture and major cabin changes are material.

NON-NEGOTIABLE LANE CONTROLS

High output is remote-operated.

NO OCCUPANT

Normal PEAK, ENDURANCE, REPEATABILITY and PROOF scoring runs have no person inside the vehicle.

HOT ZONE

Minimum physical barriers are 3 m / 10 ft for sealed runs and 6 m / 20 ft outward from open radiation paths; promoters expand them when needed.

ENGINE CONTROL

The general lane limit is 2,500 RPM unless a lower event limit is published. Improvised unattended throttle holds are prohibited.

EMERGENCY OFF

Certified-result vehicles require an outside-accessible way to stop audio energy delivery. Elevated-voltage, WALL and EXTREME systems receive stricter controls.

CURRENT PUBLIC STANDARD

XCS-1.0 RC3 Complete Rulebook

The complete public pilot standard combines the founding competition rules with Appendices A-G: measurement and meter placement, vehicle classification, safety/electrical tech, PROOF data integrity, records and official forms, event operations, and the Classification Atlas.

2026-09-10Release Candidate 3Pilot Authority